Discussion items

WhoNotes
  • The security audit was finished, David
have
  • has some comments on that.
    • Had a meeting with Tevora on Friday. David insisted that we need to add the fix in 1.2 release.
    • Currently, we may create a platform-dependent quick fix.
  • There
was
  • were several fixes to the RC:
    • If the DB is not available during work, Iroha is going down. PR is opened, but we need to discuss the solution.
    • SetSettingValue - the command is stateful, and we need to add stateful validation of that command
.
  • Description of the transfer
  • Action items

    •  
      • . Mikhail added check for the description length
      • Mikhail Boldyrev There is an anomaly in the node behaviour during sync. Looks like the ledger state async.
      • Stephan: On longevity, we have CPU increase and nodes going to reboot. I have added MST transactions to the Locust script before it. Last execution was 24 hours ago and the CPU is growing.
      • Andrei Lebedev : It is a known issue with MST messages because there is no memory limit and overflow of transactions can influence work.
    • Stepan is making a document with the list of all current issues and their status, hence we can make a release once all issues will be handled.
    • Finished prototype with the modular data model. There is a prototype with a transactional engine written on Python.  The solution was liked by Ales. We need to provide a 1-page document comparison with Iroha 2 current instructions implementation. Unfortunately, now we have no clear technical description of the ISI, so we need to get data.
    • HSM was decided to be postponed by Ales.
      • FInished implementation on the following status: Utimaco on the review, PKCS is failing with segfault, needs debug.
    • We need to concentrate on the Iroha 2 switch.
    • Will proceed with fixing CPU load on longevity and GRPC issue found by audit.
    • Fixed documentation after feedback
    • Defended TSC quarter report
    • Release notes are planned to be done soon, will proceed with commits analysis.
      • Andrei Lebedev > We made RC2 and wanted to update the release notes for it. RC2 was requested by Bulat to apply it for the internal project.
    Stephan Lavrentev
    • Currently checking all fixes in RC2
    • Working on longevity stand testing improvement
    • Discussed the CompareAndSet solution with developers of SoraNet, received the approval of the solution. Old libraries are compatible with the decision.
    • There are some not merged PRs for fixes, waiting for them to check and approve

    Action items