DatesTasksDeliverables
Jun 12th - Jun 27th
  • Arranging one-to-one meetings with mentors
  • Writing the project plan and timeline
  • Reviewing on existing interoperability solutions
  • Outlining the initial system design
  • Project Plan
  • Timeline
  • Initial System Design
Jun 27th - Jul 18th
  • Initial deployment of Hyperleder Fabric network.
  • Initial deployment of a Fabric chaincode that handles interoperability.
  • Reviewing on Fabric chaincode design
  • Researching on relays and their role in system architecture.
  • Implementation of Hyperledger Fabric
  • Implementation of Chaincode(s)
  • Relay-based System Design
Jul 18th - Sep 12th
  • Initial Deployment of a Substrate-based network
  • Adding/Writing required modules/pallets/smart contracts to the network to enable interoperability.
  • A Substrate-based Network
  • Pallets/Smart Contracts to Handle Interoperability
Sep 12th - Oct 10th
  • Evaluting the performance of a transaction made from Substrate to Fabric and vice versa via testing.
  • Assessing and discussing the security, privacy, and scalability of the proposed model.
  • Tackling the potential drawbacks of the design
  • Performance Evaluation
  • Security/Privacy and Scalability Evaluation
  • Revised System Design
Oct 10th - Nov 15th
  • Integration Test
  • Scaling up the Substrate network
  • Test Results of System Analysis
  • Scaled Version of Substrate on Various Servers
Nov 15th - Nov 29th
  • Result Documentation
  • Academic Paper
  • Related Documents from System Design to Evaluation
  • No labels