Dates | Tasks | Deliverables |
---|
Jun 12th - Jun 27th | - Arranging one-to-one meetings with mentors
- Discussing project scope and objectives Writing the project plan and timeline
- Reviewing on existing interoperability solutions
- Outlining the initial system design
| - Project Plan
- Timeline
- Initial System Design
|
Jun 27th - Jul 18th | - Initial deployment of Hyperleder Fabric network.
- Initial deployment of a Fabric chaincode that handles interoperability.
- Reviewing on Fabric chaincode design
- Researching on relays and their role in system architecture.
| - Implementation of Hyperledger Fabric
- Implementation of Chaincode(s)
- Relay-based System Design
|
Jul 18th - Aug 29th | - Initial Deployment of a Substrate-based network
- Adding/Writing required modules/pallets/smart contracts to the network to enable interoperability.
| - A Substrate-based Network
- Pallets/Smart Contracts to Handle Interoperability
|
Aug 29th - Sep 26th | - Evaluting the performance of a transaction made from Substrate to Fabric and vice versa via testing.
- Assessing and discussing the security, privacy, and scalability of the proposed model.
- Tackling the potential drawbacks of the design
| - Performance Evaluation
- Security/Privacy and Scalability Evaluation
- Revised System Design
|
Sep 26th - Oct 17th | - Integration Test
- Scaling up the Substrate network
| - Test Results of System Analysis
- Scaled Version of Substrate on Various Servers
|
Oct 17th - Nov 29th | | - Final Report
- Related Documents from System Design to Evaluation
|