Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

All Stakeholders

1) Consumers

    i) Consumer 1

    ii) Consumer 2

    iii) Consumer n

2) Regulators

   i) Energy Regulator

      A) Power Quality

      B) Tariff Rate

      C) T&D 

      D) Safety

   ii) Financial Regulator

3) Generators

    i) Utility

       A) Traditional

            a) Coal

            b) Nuclear

        B) Renewable

            a) Hydro

            b) Solar

            c) Wind

      ii) Independent Source

         a) Solar

         b) Wind

4) T&D

     i) Design

     ii) Laying Cables

     iii) Equipment Installation

     iv) Maintenance

5) General Insurance

4.2.1 Description of Environment

4.2.2 Description via four rings

4.2.3 Conclusions