DatesTasksDeliverables
Jun 12th - Jun 27th
  •  Arranging one-to-one meetings with mentors
  •  Discussing project scope and objectives Writing the project plan and timeline
  •  Reviewing on existing interoperability solutions
  •  Outlining the initial system design
    •  Project Plan
    •  Timeline
    •  Initial System Design
Jun 27th - Jul 18th
  •  Initial deployment of Hyperleder Fabric network.
  •  Initial deployment of a Fabric chaincode that handles interoperability.
  •  Reviewing on Fabric chaincode design
  •  Researching on relays and their role in system architecture.
  •  Implementation of Hyperledger Fabric
  •  Implementation of Chaincode(s)
  •  Relay-based System Design
Jul 18th - Aug 29th
  •  Initial Deployment of a Substrate-based network
  •  Adding/Writing required modules/pallets/smart contracts to the network to enable interoperability.
  •  A Substrate-based Network
  •  Pallets/Smart Contracts to Handle Interoperability
Aug 29th - Sep 26th
  •  Evaluting the performance of a transaction made from Substrate to Fabric and vice versa via testing.
  •  Assessing and discussing the security, privacy, and scalability of the proposed model.
  •  Tackling the potential drawbacks of the design
  •  Performance Evaluation
  •  Security/Privacy and Scalability Evaluation
  •  Revised System Design
Sep 26th - Oct 17th 
  •  Integration Test
  •  Scaling up the Substrate network
  •  Test Results of System Analysis
  •  Scaled Version of Substrate on Various Servers
Oct 17th - Nov 29th
  •  Result Documentation
  •  Final Report
  •  Related Documents from System Design to Evaluation