Date: Thu, 28 Mar 2024 19:39:53 +0000 (UTC)
Message-ID: <1839609941.11227.1711654793553@aws-us-west-2-hyp-confluence-1.web.codeaurora.org>
Subject: Exported From Confluence
MIME-Version: 1.0
Content-Type: multipart/related;
boundary="----=_Part_11226_2079805596.1711654793553"
------=_Part_11226_2079805596.1711654793553
Content-Type: text/html; charset=UTF-8
Content-Transfer-Encoding: quoted-printable
Content-Location: file:///C:/exported.html
11/20 Turkey Eating Edition
11/20 Turkey Eating Edition
Code & Project=
s
Hyperledger Labs: Umbra
- v0.3.0 is now available
- Hyperledger Mentorship 2020 Project: Adds the network configuration and=
fuzzing APIs to the simulation platform.
- Hyperledger Mentorship 2020 Project: Adds support for running Hyperledg=
er Iroha networks.
- Hyperledger Mentorship 2020 Project: Updates to support the University Course using Umbra
Hyperledger Fabric
- Fabric v2.3.0 <=
a class=3D"external-link" href=3D"https://github.com/hyperledger/fabric/rel=
eases/tag/v2.3.0" style=3D"text-decoration: none;" rel=3D"nofollow">now ava=
ilable.
- Introduces two new features for improved orderer and peer operations:<=
/span>
- Orderer channel management without a system channel
- Ledger snapshot
Hyperledger Besu
- Besu v20.10.1 is now available.
- Improvements include:
- Two new JSON RPC endpoints to get=
miner rewards data, `
eth_getMinerDataByB=
lockHash
`=
span> & =
`eth_getMinerDat=
aByBlockNumber`
- A new JSON RPC endpoint to change the gas limit, `
miner_changeTargetGasLimit
`
- The transaction pool now prioritizes transactions by gas prices
- EVMTool is now part of the binary distribution
- We now provide a new metric to track performance during block import: M=
egaGas/Seconds
- We have support for OpenTelemetry metrics
- We added support for qip714block config parameter in genesis file, pavi=
ng the way towards permissioning interoperability between Besu and GoQuorum=
.
Noteworthy Pull Requests: Hyperledger Iroha Edition
Hyperledger Iroha
Hyperledger Iroha
Hyperledger Iroha
Arti=
cles, Training & Tutorials
Upcom=
ing Project Maintainer Calls
- 21 NOV
- 24 NOV
- 25 NOV
- 27 NOV
------=_Part_11226_2079805596.1711654793553--